GM PIPING · SPECIALIST SOURCINGUSD reference prices · Prices exclude taxes and freight
SUPPLIER PROFILE
Jay DA · 180° return bend production video cover

Jay DA

Specialist manufacturer of 180° seamless carbon steel return bends (elbows), 1–10 in, in ASTM A234 WPB

Manufacturing / stocking / processing typeManufacturer · 180° seamless carbon steel return bends (elbows) · 1–10 in
Qualifications / equipmentQualifications: Not provided · Equipment: Elbow forming machines: 2, Presses: 3
Manufacturing / stocking / processing capacityAnnual output: 5,000 tonnes · Regular stock: 1,000 tonnes · General lead time: 1 day to 1 month
Industry strengthsMunicipal infrastructure, Factory construction, Residential and office building construction

Materials: ASTM A234 · WPB

Specifications, lead times, inspection requirements and quality responsibilities are confirmed for each order.

Match the right supplier

Check manufacturing capability, source and required qualifications.

Compare on the same basis

Align materials, standards, quantities, lead times and inspection requirements.

One quality coordinator

GM organizes inspection, issue resolution and agreed quality responsibilities.

GM / REFERENCE QUOTATIONSReference prices · Reconfirmation required
Request a current quote
USD reference prices · FX basis: 20 Nov 2026Prices exclude taxes and freight.

Reference quotations; see each item for its basis. Historical references are not current offers. Please confirm the specification, quantity, inspection requirements and final price.

Jay DAUp to 10 products per page
Back to suppliers
Jay DA · 180° return bend production video cover

Jay DA

Pipe fittings supplier · 180° seamless carbon steel return bends · Quotation on request

Supplier profile
Manufacturing / stocking / processing type: Manufacturer · 180° seamless carbon steel return bends (elbows) · 1–10 inQualifications / equipment: Qualifications: Not provided · Equipment: Elbow forming machines: 2, Presses: 3Manufacturing / stocking / processing capacity: Annual output: 5,000 tonnes · Regular stock: 1,000 tonnes · General lead time: 1 day to 1 monthIndustry strengths: Municipal infrastructure, Factory construction, Residential and office building construction

Materials: ASTM A234 · WPB

No product prices are currently listed for this supplier. Send the required specifications and quantities so GM can confirm current pricing, lead times and inspection requirements.

GM coordinates sourcing and quality management0 of 0 products